Project Management

Delivering Brownfield Projects in Live Operating Facilities

Equips project teams to plan and execute construction and upgrade work inside operating plants and buildings without disrupting ongoing production or safety.

Duration5 training days
Content4 modules · 8 sessions
On completionAccredited attendance certificate
About the programme

Course Overview

Building something new on an empty site and modifying an asset that never stops running are two different disciplines, and treating a brownfield project like a greenfield one is where many schedules and safety records fail. This course is built around the specific constraints of delivering construction, refurbishment and system upgrades inside plants, hospitals, data centres and buildings that continue operating throughout the works. Participants learn how existing operations, live services and site personnel change every planning assumption, from access sequencing and isolation of systems to the scheduling of tie-ins around production windows. The course covers how to survey and verify as-built conditions that drawings no longer reflect, how to plan shutdowns and outages that intrude on operations for the shortest possible time, and how permit-to-work and isolation regimes are coordinated between the operator and the project team. Delivered through a running brownfield case study, the course also addresses the interface risks unique to working near live plant: unexpected finds, operator veto over timing, and the compounding effect of small delays on a tightly sequenced outage. Participants finish able to plan brownfield sequencing, negotiate access windows with operations, and manage the handback of modified systems into live service.

Expected Learning Outcomes

01

Distinguish brownfield planning constraints from greenfield assumptions before sequencing the works.

02

Verify existing as-built conditions on site rather than relying on outdated drawings and records.

03

Sequence construction activities around live production, occupancy or clinical operating windows.

04

Plan shutdown, outage and tie-in work to minimise disruption to ongoing operations.

05

Coordinate permit-to-work and isolation procedures jointly with the facility's operations team.

06

Manage unexpected finds and hidden conditions discovered once work starts in the live environment.

07

Hand back modified systems into service with verified testing and operator sign-off.

Who Should Attend

01

Project managers delivering upgrades or refurbishment inside operating plants and buildings

02

Shutdown and turnaround planners coordinating outage work with production schedules

03

Facilities and asset managers hosting contractor works inside occupied or live sites

04

Construction managers moving from new-build projects into brownfield modification work

05

Engineers responsible for tie-ins between new installations and existing live systems

06

Health, safety and operations personnel coordinating permits and isolations with project teams

Course Modules

Select any module to see its sessions and points.

01

Planning Constraints Unique to Live Operating Environments

2 sessions · 8 points

Session 1Distinguishing Brownfield Risk from Greenfield Assumptions

  • Identify which planning assumptions from greenfield delivery do not transfer safely to a live operating site.
  • Map the operational calendar of the facility so construction windows are set around real production commitments.
  • Assess how occupied or operating status changes access, noise, vibration and contamination constraints on the works.
  • Build a stakeholder map that includes operations, safety and site security as co-decision-makers, not observers.

Session 2Verifying As-Built Conditions Before Design Freeze

  • Commission intrusive surveys and laser scanning to confirm existing conditions that drawings may misrepresent.
  • Reconcile survey findings with historical as-built records and flag discrepancies before detailed design proceeds.
  • Identify buried, hidden or embedded services likely to be encountered once demolition or excavation starts.
  • Set a design freeze point that accounts for verified conditions rather than assumed or historical data alone.
02

Sequencing Work Around Live Operations

2 sessions · 8 points

Session 1Scheduling Around Production, Occupancy and Clinical Windows

  • Build a schedule that treats operational blackout periods as fixed constraints rather than negotiable buffers.
  • Sequence noisy, dusty or high-vibration activities into windows agreed in advance with the operations team.
  • Plan phased handover of work areas so operations can reoccupy completed zones before the whole project finishes.
  • Coordinate multiple trades working near live plant so their combined footprint does not exceed agreed access limits.

Session 2Planning Shutdowns, Outages and Tie-Ins

  • Break tie-in work into a minute-by-minute critical path so the outage window is used for nothing but essential tasks.
  • Pre-fabricate and pre-test connecting sections off-line so on-site outage time is limited to final connection only.
  • Rehearse the outage sequence with the full team before the live event to surface timing and access conflicts.
  • Build contingency and recovery plans for a tie-in that overruns its planned outage window.
03

Managing Safety Interfaces with Site Operations

2 sessions · 8 points

Session 1Coordinating Permit-to-Work and Isolation with Operations

  • Establish a joint permit-to-work process that gives the operator final authority over isolations affecting live systems.
  • Sequence isolation, lock-off and verification steps so construction work never proceeds on a system believed live.
  • Brief project personnel on site-specific hazards that differ from a standard construction site risk assessment.
  • Audit permit compliance on a live site regularly rather than assuming procedures are followed once agreed.

Session 2Responding to Unexpected Finds and Hidden Conditions

  • Define a stop-work and assessment protocol for use the moment an unexpected condition or service is uncovered.
  • Assess the safety, programme and cost impact of a hidden condition before deciding how to proceed with the works.
  • Notify the client and operations team promptly so operational decisions affected by the find are not delayed.
  • Update the risk register and contingency allowance once a pattern of unexpected finds starts to emerge.
04

Testing, Handback and Continuous Operation

2 sessions · 8 points

Session 1Testing and Commissioning Without Disrupting Live Systems

  • Plan commissioning tests that can run in parallel with live operations wherever isolation allows it.
  • Sequence functional testing so failures are caught and corrected before a system is reconnected to live service.
  • Coordinate commissioning specialists with operations staff who must operate the system once testing begins.
  • Document test results in a form the operator can use as evidence of acceptance, not just project completion.

Session 2Handing Back Modified Systems into Live Service

  • Agree handback criteria with operations before work starts so acceptance is not renegotiated at the final stage.
  • Brief operating and maintenance staff on changes to systems before responsibility for them passes back to them.
  • Update operating procedures, drawings and maintenance records to reflect the as-modified condition of the asset.
  • Capture lessons learned on live-site interface management for use on the facility's next brownfield project.

What the participant receives

4 course modules

A structured syllabus

8 training sessions

across 5 days

32 detailed points

Applied, detailed content

Accredited attendance certificate

On completing the programme

Complete your registration

We will contact you within one business day to confirm.

Ready to start?

Reserve your seat and start building the skill.

Enroll now

Share this course